Bailey Streetscene were asked to supply and install a covered walkway along the main entrance to the building that incorporated wall fixing arrangement and integral gutter system.
The Canopy was designed to compensate for a fall to floor level whilst maintaining weather protection.
The structure was manufactured in galvanised and powder coated steel sections with integral gutter system to provide a streamlined and efficient system.
Roles & Responsibilities:
- Initial design consultation
- Outlining costing proposals
- Project management
- Manufacture, supply, installation, site liaison
- O&M and RAMs documents produced
- Additional works
- Design / adaptation of existing product to comply with the project requirements